Details for developers, designers, and builders
New developments located in the False Creek Neighbourhood Energy Utility (NEU) service area are required to connect to the City-owned system for space heating and domestic hot water, as per the Energy Utility System By-Law No. 9552 PDF file (317 KB) . Developers of new buildings in the Service Area are responsible for applying to the City for thermal energy service and for ensuring the building is designed to connect to the utility.
New developments applying for a building permit after September 1, 2019 are required to pay an initial connection levy. This levy is similar to connection fees used for water and sewer utilities and was developed after extensive consultation with industry. This cost to the development is offset by cost savings for the connected building’s mechanical system and building envelope. 
Service area
At the rezoning or development permit stage, each building is reviewed by NEU staff to determine if it will connect to the neighbourhood energy utility.
The review at this stage ensures there is sufficient space in a suitable location for the energy transfer station room, and that utility pipe entry points are appropriately located for connection between the utility system and the new building.
Before a building permit is issued, the developer must:
The NEU Engineer conducts a connectivity review of the building's HVAC system to ensure compatibility with the neighbourhood energy utility's operational parameters. This process can take 2 to 3 months and should be initiated as early as possible once the building’s mechanical design is complete.
Pay the initial connection levy and any charges related to an alternative location for the NEU equipment room (if applicable).